Taking out a load-bearing wall is one of the biggest changes you can make to a home, and it has to be done with care. The ceiling is propped first, steel is installed to carry the load, and only then is the space finished. We have done this on kitchens, living rooms and whole floors.
In one reform we removed two load-bearing walls to join a closed kitchen, dining room and living space into a single open-plan area. In another, at Monte Horquera, we stripped back a whole floor, opened the ceiling, installed steel columns and beams, and built a new reinforced concrete staircase from scratch.
The ceiling is supported with adjustable props before any wall comes out.
Steel beams and columns
Steel installed to carry the load, with new foundations for the columns.
New openings and lintels
Larger openings formed where the layout needs them.
Reinforced concrete staircases
Formwork and reinforcement built on site, ready for the concrete pour.
Finishing
Boarding, plastering, sanding and painting once the structure is complete.
See it for yourself
Video 1:25
Two Load-Bearing Walls Removed
Two load-bearing walls taken out to turn a closed kitchen and dining room into one open-plan living space, with the structure properly engineered and supported at every stage.
Engineered steel beams and columns
Temporary propping
New foundations for the columns
Plastering and finishing
Open-plan kitchen and living area
Frequently asked questions
Can you remove a load-bearing wall?+
Yes. We prop the ceiling, install steel beams and columns, and then board, plaster and finish the area. Watch the project video above.
Do you build staircases?+
Yes. At Monte Horquera we formed and reinforced a new concrete staircase on site.
Is the structural work checked?+
Michael signs off the quality of every job personally before you see it.
Talk to Michael's team
Free consultation, no obligation. Michael signs off the quality of every job personally.